Extension of the photovoltaic (PV) system

Our Photovoltaic plant, installed in 2020, has been extended during 2022. We have grown from a total peak capacity of 100kW to 750kW, with a consequent reduction of CO2 emissions to 400 tons per year.

This investment is part of the general commitment of our company towards an environmental sustainable economy.

Casone efforts in this engagement includes the installation of a methane gas trigenerator in 2019, the product certification “Plastic Second Life” and EcoVadis certification.

Share

This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.